Location | Target MW | Projects |
---|---|---|
United States | 995 | 22 |
Ireland | 313 | 9 |
United Kingdom | 443 | 5 |
Australia | 122 | 18 |
Total | 1,873 | 54 |
United States
BNRG entered the US market in 2016 and we’ve successfully completed a portfolio of projects in Oregon totalling 29 MW. We’re currently constructing a 448 MW portfolio in Maine.
Pipeline Profile | Total | 2024 | 2025 | 2026 | 2027 | 2028 |
---|---|---|---|---|---|---|
Total MWs Commencing Construction | 1,023 | 9.1 | 290.5 | 391.75 | 304 | — |
Maine | 448 | 9.1 | 91.5 | 77.75 | 112 | — |
Indiana | 492 | — | 100 | 200 | 192 | — |
South Carolina | 158 | — | 99 | 66 | — | — |
Ohio | — | — | — | 48 | — | — |
Total Projects | 22 | 2 | 11 | 7 | 2 | — |
Ireland
We’re at home in Ireland and we’ve been developing there since 2015 to deliver a portfolio of 313 MW with the first phase to be constructed in 2024.
Pipeline Profile | Total | 2024 | 2025 | 2026 | 2027 | 2028 |
---|---|---|---|---|---|---|
Total MWs Commencing Construction | 313 | 43 | 24 | 61 | 185 | |
Total Projects | 9 | 4 | 6 | 5 | 4 | 5 |
United Kingdom
BNRG successfully developed and constructed over 100 MW of projects under the UK’s Feed-In Tariff and Renewable Obligation Certificate schemes. We re-entered the UK market in 2019 with an ambition to deliver a portfolio of 443 MW by 2028.
Pipeline Profile | Total | 2024 | 2025 | 2026 | 2027 | 2028 |
---|---|---|---|---|---|---|
Total MWs Commencing Construction | 443 | — | 43 | — | 100 | 300 |
Total Projects | 5 | — | 2 | 2 | 1 |
Australia
We established BNRG Australia in 2018 to develop a pipeline of greenfield projects and in 2020 established a relationship with a local partner to develop a pipeline of over 600 MW.
Pipeline Profile | Total | 2024 | 2025 | 2026 | 2027 | 2027 |
---|---|---|---|---|---|---|
Total MWs Commencing Construction | 122 | 96 | 26 | — | — | — |
Total Projects | 18 | 14 | 4 | — | — | — |
United States
![](https://bnrg.ie/wp-content/uploads/2024/10/DJI_0383-750x450.jpg)
North Anson • Maine, USA • 2.74 MW • Constructed 2024
Funding: BNRG, Impax Group
North Anson • Maine, USA • 2.74 MW • Constructed 2024
Funding: BNRG, Impax Group
![](https://bnrg.ie/wp-content/uploads/2024/10/Norridgewock-9-25-24-750x450.jpg)
Norridgewock • Maine, USA • 2.72 MW • Constructed 2024
Funding: BNRG, Impax Group
Norridgewock • Maine, USA • 2.72 MW • Constructed 2024
Funding: BNRG, Impax Group
![](https://bnrg.ie/wp-content/uploads/2024/10/DJI_0488-750x450.jpg)
Sherman • Maine, USA • 3.6 MW • Constructed 2024
Funding: BNRG, Impax Group
Sherman • Maine, USA • 3.6 MW • Constructed 2024
Funding: BNRG, Impax Group
![](https://bnrg.ie/wp-content/uploads/2024/10/DJI_0463-750x450.jpg)
Daves Way • Maine, USA • 5.57 MW • Constructed 2024
Funding: BNRG, Impax Group
Daves Way • Maine, USA • 5.57 MW • Constructed 2024
Funding: BNRG, Impax Group
![](https://bnrg.ie/wp-content/uploads/2024/10/20231002_124430-750x450.jpg)
Rangeley • Maine, USA • 4.06 MW • Constructed 2024
Funding: BNRG, Impax Group
Rangeley • Maine, USA • 4.06 MW • Constructed 2024
Funding: BNRG, Impax Group
![](https://bnrg.ie/wp-content/uploads/2024/07/DJI_0094-750x450.jpg)
Larson • Maine, USA • 6.52 MW • Constructed 2023
Funding: BNRG, Impax Group
Larson • Maine, USA • 6.52 MW • Constructed 2023
Funding: BNRG, Impax Group
![](https://bnrg.ie/wp-content/uploads/2023/12/Limestone-750x450.jpg)
Limestone • Maine, USA • 5.32 MW • Constructed 2023
Funding: BNRG, Impax Group
Limestone • Maine, USA • 5.32 MW • Constructed 2023
Funding: BNRG, Impax Group
![](https://bnrg.ie/wp-content/uploads/2023/12/DJI_0831-750x450.jpg)
Masardis • Maine, USA • 6.56 MW • Constructed 2023
Funding: BNRG, Impax Group
Masardis • Maine, USA • 6.56 MW • Constructed 2023
Funding: BNRG, Impax Group
![](https://bnrg.ie/wp-content/uploads/2023/12/DJI_0623-750x450.jpg)
Nicolin • Maine, USA • 4.62 MW • Constructed 2023
Funding: BNRG, Impax Group
Nicolin • Maine, USA • 4.62 MW • Constructed 2023
Funding: BNRG, Impax Group
![](https://bnrg.ie/wp-content/uploads/2022/12/Winslow-750x450.jpg)
Winslow • Maine, USA • 10.60 MW • Constructed 2022
Funding: BNRG, Carlyle Group
Winslow • Maine, USA • 10.60 MW • Constructed 2022
Funding: BNRG, Carlyle Group
![](https://bnrg.ie/wp-content/uploads/2022/12/Palmyra-2022-750x450.jpg)
Palmyra • Maine, USA • 7 MW • Constructed 2022
Funding: BNRG, Carlyle Group
Palmyra • Maine, USA • 7 MW • Constructed 2022
Funding: BNRG, Carlyle Group
![](https://bnrg.ie/wp-content/uploads/2022/12/Hancock-Snowy-750x450.jpg)
Hancock South • Maine, USA • 10.20 MW • Constructed 2022
Funding: BNRG, Carlyle Group
Hancock South • Maine, USA • 10.20 MW • Constructed 2022
Funding: BNRG, Carlyle Group
![](https://bnrg.ie/wp-content/uploads/2022/12/Hancock-2022-750x450.jpg)
Hancock North • Maine, USA • 10.20 MW • Constructed 2022
Funding: BNRG, Carlyle Group
Hancock North • Maine, USA • 10.20 MW • Constructed 2022
Funding: BNRG, Carlyle Group
![](https://bnrg.ie/wp-content/uploads/2021/05/Milo-Constructed-750x450.png)
Milo • Maine, USA • 27.4 MW • Constructed 2021
Funding: Carlyle Group
Milo • Maine, USA • 27.4 MW • Constructed 2021
Funding: Carlyle Group
![](https://bnrg.ie/wp-content/uploads/2021/05/Oxford-Mechanical-Completion-750x450.jpg)
Oxford • Maine, USA • 12.9 MW • Constructed 2021
Funding: Carlyle Group
Oxford • Maine, USA • 12.9 MW • Constructed 2021
Funding: Carlyle Group
![](https://bnrg.ie/wp-content/uploads/2021/05/Augusta-Mechanical-Completion-750x450.jpg)
Augusta • Maine, USA • 8.7 MW • Constructed 2021
Funding: Carlyle Group
Augusta • Maine, USA • 8.7 MW • Constructed 2021
Funding: Carlyle Group
![](https://bnrg.ie/wp-content/uploads/2020/10/Fairfield-7-750x450.jpg)
Fairfield • Maine, USA • 7.4 MW • Constructed 2021
Funding: Carlyle Group
Fairfield • Maine, USA • 7.4 MW • Constructed 2021
Funding: Carlyle Group
![](https://bnrg.ie/wp-content/uploads/2020/07/Day-Hill-750x450.jpg)
Day Hill • Oregon, USA • 3.1 MW • Constructed 2020
Funding: Greenbacker
Day Hill • Oregon, USA • 3.1 MW • Constructed 2020 • Funding: Greenbacker
![](https://bnrg.ie/wp-content/uploads/2020/07/Palmer-Creek-750x450.jpg)
Palmer Creek • Oregon, USA • 3.3 MW • Constructed 2020
Funding: Greenbacker
Palmer Creek • Oregon, USA • 3.3 MW • Constructed 2020 • Funding: Greenbacker
![](https://bnrg.ie/wp-content/uploads/2020/07/Rafael-750x450.jpg)
Rafael • Oregon, USA • 3.2 MW • Constructed: 2019
Funding: SunTrust, CarVal
Rafael • Oregon, USA • 3.2 MW • Constructed: 2019 • Funding: SunTrust, CarVal
![](https://bnrg.ie/wp-content/uploads/2020/07/Kale-Patch-750x450.jpg)
Kale Patch • Oregon, USA • 3.3 MW • Constructed: 2019
Funding: SunTrust, CarVal
Kale Patch • Oregon, USA • 3.3 MW • Constructed: 2019 • Funding: SunTrust, CarVal
![](https://bnrg.ie/wp-content/uploads/2020/07/Case-Creek-750x450.jpg)
Case Creek • Oregon, USA • 3.2 MW • Constructed: 2019
Funding: SunTrust, CarVal
Case Creek • Oregon, USA • 3.2 MW • Constructed: 2019 • Funding: SunTrust, CarVal
![](https://bnrg.ie/wp-content/uploads/2020/07/Boring-750x450.jpg)
Boring • Oregon, USA • 3.4 MW • Constructed: 2019
Funding: SunTrust, CarVal
Boring • Oregon, USA • 3.4 MW • Constructed: 2019 • Funding: SunTrust, CarVal
![](https://bnrg.ie/wp-content/uploads/2020/07/O-Neill-Creek-750x450.jpg)
O’Neill Creek • Oregon, USA • 3.3 MW • Constructed: 2019
Funding: SunTrust, CarVal
O’Neill Creek • Oregon, USA • 3.3 MW • Constructed: 2019 • Funding: SunTrust, CarVal
![](https://bnrg.ie/wp-content/uploads/2020/07/Ballston-750x450.jpg)
Ballston • Oregon, USA • 2.9 MW • Constructed: 2018
Funding: SunTrust, CarVal
Ballston • Oregon, USA • 2.9 MW • Constructed: 2018 • Funding: SunTrust, CarVal
![](https://bnrg.ie/wp-content/uploads/2020/07/Labish-2-750x450.jpg)
Labish • Oregon, USA • 3.3 MW • Constructed: 2018
Funding: SunTrust, CarVal
Labish • Oregon, USA • 3.3 MW • Constructed: 2018 • Funding: SunTrust, CarVal
United Kingdom
![](https://bnrg.ie/wp-content/uploads/2020/07/Bryn-Bachau-750x450.jpg)
Bryn Bachau • Wales, UK • 4.4 MW • Constructed: 2016
Funding: BNRG Langmead, HSBC
Bryn Bachau • Wales, UK • 4.4 MW • Constructed: 2016 • Funding: BNRG Langmead, HSBC
![](https://bnrg.ie/wp-content/uploads/2020/09/Manor-Farm-3-750x450.jpg)
Manor Farm • West Sussex, UK • 5 MW • Constructed: 2016 • Funding: BNRG Langmead, HSBC
Manor Farm • West Sussex, UK • 5 MW • Constructed: 2016 • Funding: BNRG Langmead, HSBC
![](https://bnrg.ie/wp-content/uploads/2020/07/Lagness-750x450.jpg)
Lagness • West Sussex, UK • 5 MW • Constructed: 2016
Funding: BNRG Langmead, HSBC
Lagness • West Sussex, UK • 5 MW • Constructed: 2016 • Funding: BNRG Langmead, HSBC
![](https://bnrg.ie/wp-content/uploads/2020/07/Ferry-Farm-Community-750x450.jpg)
Ferry Farm Community • West Sussex, UK • 4.4 MW • Constructed: 2016 • Funding: BNRG Langmead, Triplepoint, Communities for Renewables
Ferry Farm Community • West Sussex, UK • 4.4 MW • Constructed: 2016 • Funding: BNRG Langmead, Triplepoint, Communities for Renewables
![](https://bnrg.ie/wp-content/uploads/2020/07/Ferry-Farm-750x450.jpg)
Ferry Farm • West Sussex, UK • 5 MW • Constructed: 2015
Funding: BNRG Langmead, HSBC
Ferry Farm • West Sussex, UK • 5 MW • Constructed: 2015 • Funding: BNRG Langmead, HSBC
![](https://bnrg.ie/wp-content/uploads/2020/07/Sycamore-Farm-750x450.jpg)
Sycamore Farm • Kent, UK • 20 MW • Constructed: 2014
Funding: BNRG, Lightsource, Octopus
Sycamore Farm • Kent, UK • 20 MW • Constructed: 2014 • Funding: BNRG, Lightsource, Octopus
![](https://bnrg.ie/wp-content/uploads/2020/07/Bilsham-Farm-750x450.jpg)
Bilsham Farm • West Sussex, UK • 15 MW • Constructed: 2014
Funding: BNRG, Next Energy Capital
Bilsham Farm • West Sussex, UK • 15 MW • Constructed: 2014 • Funding: BNRG, Next Energy Capital
![](https://bnrg.ie/wp-content/uploads/2020/07/Turners-Bank-2-750x450.jpg)
Turners Bank • Kent, UK • 250 kW • Constructed: 2014
Funding: BNRG, Abundance Investment
Turners Bank • Kent, UK • 250 kW • Constructed: 2014 • Funding: BNRG, Abundance Investment
![](https://bnrg.ie/wp-content/uploads/2020/07/Apse-New-Barn-750x450.jpg)
Apse New Barn • Isle of Wight, UK • 3.1 MW
Constructed: 2013 • Funding: BNRG, Lightsource, Octopus
Apse New Barn • Isle of Wight, UK • 3.1 MW • Constructed: 2013 • Funding: BNRG, Lightsource, Octopus
![](https://bnrg.ie/wp-content/uploads/2020/07/Chawton-Farm-750x450.jpg)
Chawton Farm • Isle of Wight, UK • 3.6 MW
Constructed: 2013 • Funding: BNRG, Lightsource, Octopus
Chawton Farm • Isle of Wight, UK • 3.6 MW • Constructed: 2013 • Funding: BNRG, Lightsource, Octopus
![](https://bnrg.ie/wp-content/uploads/2020/07/Hoo-Farm-750x450.jpg)
Hoo Farm • Kent, UK • 250 kW • Constructed: 2012
Funding: BNRG, Abundance Investment
Hoo Farm • Kent, UK • 250 kW • Constructed: 2012 • Funding: BNRG, Abundance Investment
![](https://bnrg.ie/wp-content/uploads/2020/07/ROF-Puriton-750x450.jpg)
ROF Puriton • Somerset, UK • 4.3 MW • Constructed: 2011
Funding: BNRG, Element Power, Foresight
ROF Puriton • Somerset, UK • 4.3 MW • Constructed: 2011 • Funding: BNRG, Element Power, Foresight
![](https://bnrg.ie/wp-content/uploads/2020/07/Summerway-Drove-750x450.jpg)
Summerway Drove • Somerset, UK • 2 MW • Constructed: 2011
Funding: BNRG, Element Power, Foresight
Summerway Drove • Somerset, UK • 2 MW • Constructed: 2011 • Funding: BNRG, Element Power, Foresight
![](https://bnrg.ie/wp-content/uploads/2020/09/Gunsko-For-Brochure-750x450.jpg)
Hill Farm • Isle of Wight, UK • 10.2 MW • Constructed: 2013 • Funding: BNRG, Lightsource, Octopus
Hill Farm • Isle of Wight, UK • 10.2 MW • Constructed: 2013 • Funding: BNRG, Lightsource, Octopus
![](https://bnrg.ie/wp-content/uploads/2022/12/file7-750x450.jpeg)
Woodchurch Farm • Kent, UK • 250 kW • Constructed: 2014 • Funding: BNRG, Abundance Energy
Woodchurch Farm • Kent, UK • 250 kW • Constructed: 2014 • Funding: BNRG, Abundance Energy
![](https://bnrg.ie/wp-content/uploads/2022/12/Labish-2-750x450.jpeg)
Merston Grainstore • West Sussex, UK • 250 kW • Constructed: 2015 • Funding: BNRG Langmead, HSBC
Merston Grainstore • West Sussex, UK • 250 kW • Constructed: 2015 • Funding: BNRG Langmead, HSBC
Northern Ireland
![](https://bnrg.ie/wp-content/uploads/2020/07/Laurel-Hill-1-750x450.jpg)
Laurel Hill • Co. Down, N. Ireland • 14.2 MW • Constructed: 2018
Funding: BNRG, Foresight
Laurel Hill • Co. Down, N. Ireland • 14.2 MW • Constructed: 2018 • Funding: BNRG, Foresight
Republic of Ireland
![](https://bnrg.ie/wp-content/uploads/2024/10/kerdiffstown-750x450.jpg)
Kerdiffstown • Kildare, Ireland • 7 MW
Constructed: 2024 • Funding: BNRG, Impax Group
Kerdiffstown • Kildare, Ireland • 7 MW
Constructed: 2024 • Funding: BNRG, Impax Group
![](https://bnrg.ie/wp-content/uploads/2022/11/Millvale-750x450.jpg)
Millvale • Wicklow, Ireland • 15 MW
Constructed: 2022 • Funding: BNRG, NEOEN
Millvale • Wicklow, Ireland • 15 MW
Constructed: 2022 • Funding: BNRG, NEOEN
![](https://bnrg.ie/wp-content/uploads/2022/11/IMG-20220523-WA0009-750x450.jpg)
Hilltown • Meath, Ireland • 18 MW
Constructed: 2022 • Funding: BNRG, NEOEN
Hilltown • Meath, Ireland • 18 MW
Constructed: 2022 • Funding: BNRG, NEOEN
![](https://bnrg.ie/wp-content/uploads/2022/11/20220401_160527-750x450.jpg)
Hortland PV • Kildare, Ireland • 25.2 MW
Constructed: 2022 • Funding: BNRG, NEOEN
Hortland PV • Kildare, Ireland • 25.2 MW
Constructed: 2022 • Funding: BNRG, NEOEN
![](https://bnrg.ie/wp-content/uploads/2020/07/National-University-Maynooth-750x450.jpg)
National University • Maynooth, Ireland • 100 kW • Constructed: 2017 • Funding: NUI, Maynooth
National University • Maynooth, Ireland • 100 kW • Constructed: 2017 • Funding: NUI, Maynooth
![](https://bnrg.ie/wp-content/uploads/2020/07/French-Embassy-750x450.jpg)
French Embassy • Dublin, Ireland • 100 kW • Constructed: 2017
Funding: French Embassy
French Embassy • Dublin, Ireland • 100 kW • Constructed: 2017 • Funding: French Embassy
Bulgaria
![](https://bnrg.ie/wp-content/uploads/2020/09/file7-750x450.jpeg)
Kamenar • Burgas, Bulgaria • 6 MW Constructed: 2012 • Funding: BNRG, Private Wealth
Kamenar • Burgas, Bulgaria • 6 MW Constructed: 2012 • Funding: BNRG, Private Wealth
![](https://bnrg.ie/wp-content/uploads/2020/09/Bulgaria-12-750x450.jpg)
Kameno • Burgas, Bulgaria • 4 MW Constructed: 2012 • Funding: BNRG, Private Wealth
Kameno • Burgas, Bulgaria • 4 MW Constructed: 2012 • Funding: BNRG, Private Wealth
Greece
![](https://bnrg.ie/wp-content/uploads/2020/09/greece-3.jpg)
Clean Energy Portfolio • Greece • 2 MW Constructed: 2012 • Funding: BNRG, Private Wealth
Clean Energy Portfolio • Greece • 2 MW Constructed: 2012 • Funding: BNRG, Private Wealth