enquiry form

High RESS strike prices down to connection costs and PPA length | Solar Power Portal


Solar Panel with water droplets

High grid connection costs resulted in a solar strike price in Ireland’s first Renewable Electricity Support Scheme (RESS) auction “significantly higher than anywhere else in Europe” according to the Irish Solar Energy Association(ISEA).

Published by Solar Power Portal

Click here

Back to all news